
Project type: Bathroom renovation and refurbishment
Location: East Finchley
By Wittick Building
Bathroom Renovation in East Finchley
Wittick Building completed a full bathroom renovation in East Finchley, transforming an outdated room into a clean, practical and modern bathroom with a walk-in shower finish.
The project began with a full strip-out ofthe existing bathroom so the room could be properly assessed and prepared. Thisgave the team the chance to deal with the important preparation work behind thefinished result, including floor preparation, wall preparation and serviceadjustments.
Work included removing the old bathroom,preparing the floor, building up the walls with appropriate materials,plasterboarding, plastering, tiling, fitting the shower area and completing thefinal bathroom finish.
The finished bathroom gives the client amore practical layout, a cleaner modern appearance and a better-quality finish.The project shows how Wittick Building manages both preparation and finishingdetail, which is especially important in bathrooms where moisture, tiling,plumbing and long-term durability all matter.
Project Location
East Finchley
Work Completed
· Bathroom renovation
· Full strip-out
· Floor preparation
· Wall preparation
· Plasterboarding
· Plastering
· Tiling
· Walk-in shower installation
· Bathroom finishing
· Final clean and handover
Why This Project Matters
This case study is a useful example forhomeowners planning a bathroom renovation in East Finchley, Barnet or NorthLondon. It shows the preparation required before the visible finish can beinstalled, from removing the old bathroom through to floor, wall, plastering,tiling and final shower work.
Get In Touch For A Quote Today
Ready to transform your space? Get in touch for a quote.

