header_background-image

A kitchen renovation is one of the most significant investments you'll make in your home — and one of the most disruptive if it's not planned properly. Getting the sequence right, knowing where to spend and where to save, and understanding what's involved from a building perspective will save you money, stress, and a lot of time eating takeaways.

Start With the Layout

Before you look at a single cabinet door or worktop sample, think about the layout. The layout determines everything — where the services go, how much space you have, and how the kitchen functions day to day.

Common kitchen layouts:

  • Galley — two parallel runs of units. Efficient use of space, good workflow. Best for narrow kitchens
  • L-shape — two runs at 90 degrees. Flexible and works in most spaces
  • U-shape — three runs forming a U. Maximum storage and worktop space
  • Island — central unit providing extra worktop, storage, and often seating. Needs good circulation space around it — minimum 900mm either side
If you're considering removing a wall to open the kitchen to a dining or living area, this is the time to plan it. A structural engineer needs to be involved, and the work needs to happen before any new kitchen is installed.

Where to Spend Your Budget

Spend more on:

  • Worktops — this is what you touch and look at every day. Solid quartz or granite will outlast the cabinets
  • Sink and tap — cheap taps wear out quickly and leak; a quality tap will last 20+ years
  • Appliances — particularly the oven, hob, and extractor. These affect how you cook every day
  • Cabinet carcasses — the box inside the door. Solid carcasses from reputable suppliers last far longer than flat-pack alternatives

Where you can be more flexible:

  • Cabinet doors — doors can be replaced without replacing the carcass. Some people refresh the look after 10 years with new doors only
  • Handles — a relatively cheap way to change the look

The Order of Works — Why Sequence Matters

A kitchen renovation involves multiple trades, and they need to work in the right order. Getting this wrong causes delay, rework, and additional cost.

  • Strip-out — remove existing kitchen, flooring, and any walls being demolished
  • Structural work — RSJ installation if walls are being removed
  • First fix electrics — new circuits, socket positions, lighting circuits run before walls are plastered
  • First fix plumbing — waste and supply pipes run to new positions
  • Plastering — walls made good, new surfaces skimmed
  • Second fix — kitchen units installed, appliances fitted
  • Second fix electrics — sockets, switches, and lighting completed
  • Second fix plumbing — sink, dishwasher, and washing machine connected
  • Tiling — splashbacks and floor
  • Decorating — final paint, finishing touches

Integrated Appliances

Integrated appliances (fridge, dishwasher, freezer) are built behind cabinet doors so they blend with the kitchen. They cost more than freestanding equivalents but give a cleaner look. Plan for them from the outset — the cabinets need to be specified accordingly, and the electrical and plumbing connections need to be in the right positions.

Lighting

Kitchen lighting is often underthought. Good kitchen lighting combines:

  • Ambient lighting — general ceiling light for the whole room
  • Task lighting — under-cabinet LEDs lighting the worktop directly
  • Feature lighting — pendants over an island or dining area

All lighting positions need to be planned and first-fix wiring installed before plastering. Adding lighting after is significantly more disruptive.

Wittick Building Tip: At Wittick Building, we manage the full kitchen renovation from strip-out to final decoration, coordinating all trades so you don't have to. We'll also advise on layout and sequence from the outset.

Related News

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Kitchens & Bathrooms
6 min read

Plastering - What You Need to Know

Everything you need to know about plastering - types of plaster, skimming vs full re-plaster, drying times, and when you'll need it. Wittick Building, North London & Hertfordshire.

Read more
Kitchens & Bathrooms
7 min read

Shower Leaks - Causes & How to Fix Them

Shower leaking? Wittick Building explains the six most common causes of shower leaks — from failed silicone to tanking failures — and when to call a professional. North London & Hertfordshire.

Read more
Kitchens & Bathrooms
8 min read

Bathroom Planning Guide

Planning a bathroom renovation? Wittick Building's guide covers suite options, underfloor heating, ventilation regulations, and small bathroom tips. North London & Hertfordshire.

Read more

Get In Touch For A Quote Today

Ready to transform your space? Get in touch for a quote.

cta_background-image